We have now received the roof bell tower from the church in Clayhall Road for evaluation. The timber structure was found to be rotten and it has been agreed that the whole tower will need to be re-built in oak, requested by the church. The teams in P18 and the assembly room are now putting together a cutting lists to work out the cost of the materials. A representative from the church visited the Shed last week and the two workshops have agreed to source the costing of the materials and meet up before any further work continues.TBC